Prewet, 1' to 2' at 100F/37,8C Several changes of water (2 - 4)
Develop as recommended
Bleach
wash
Fix
Wash
Stabilizer / final rinse
Same setup in my Jobo CPA-2 with elevator.
I start with a 2 minutes pre-wet
Then the 3:15 minutes C41 developer
a quick rinse
4:00 minutes Bleach
a quick rinse
6:00 minutes Fix
wash the film 1-2-4 minutes water change
Outside the Jobo due to foam contamination,
1 minute stabilizer
drying.

I am using the Rollei Digibase C41 chemicals but in fact it's a small re-filled Fuji Hunt C41 kit.
It's containing C41 part A-B-C + starter
Bleach
Fixer
and a Stabilizer
Some syringes for measuring out.

The (new) instruction manual is pretty clear how to handle it.

Best regards,

Роберт