Thanks to both of you for the replies..

My process is as follows:

3. Pre-soak ~39C for 1-3m depending on my impatience
2. Develop at ~39C for 3.5m
3. Rinse 4-5x tap water, 25-30C
3. Blix 6.5m (give or take) at room temperature (varying between 20C-25C during the Summer)
4. Wash 10m, tap water, 25-30C
5. Pflo 1m

Would anyone like to chime in on the stabilizer and bleach bypass questions?

Best regards and Thanks!