Quote Originally Posted by Curt View Post
As it is for trams in all the airports I've been to.
That's much easier to do at airport rail systems - they're all new, and can be designed and built to standards, and retrofits are easy because the entire system is built to the same spec. About the only thing standard on the NYC Subway is the rail gauge and the voltage the trains run on.