Quote Originally Posted by Photo Engineer View Post
When you are making huge batches and you are running continuously[]
PE
PE, When pouring out 5000 ft of film, how much deviation was there from head to tail, and what was acceptable? Was EK able to get it pretty much the same for the whole roll?