Quote Originally Posted by StoneNYC View Post
Wait are you the guy I was referring to? Can you post the times I never wrote it down last time .. I will this time I swear! lol
C22 dev as a starting point 20 minutes at 20C, bleach 10min, fix 10min. Bleach and fix times are a bit overkilled, with fresh chem they will go to completion faster (5-6 min).

For C41 film dev time is a bit longer, 22-23min, for those Agfacolor CN17 films I use slightly less, 18 min.

All those times are with replenished Tetenal ergoline minilab C-41 chemistry, separate dev/bleach/fix. Between steps I rinse 2x15 inversions with water. After final wash ca 1min in C-41 stabilisator. That's basically it.
My usual room temperature is ca 22C, so the actual times are accordingly a bit shorter.