Rudi;

The OP wanted to speed up the process time. Using a separate fix and then a blix would increase process time. As for using a plain fix after development, (if that were the case) then the fix capacity would diminish by carryover.

A sequence of Dev, Stop, rinse?, Fix, rinse?, blix would be needed and that is just too long but it would increase blix life.

PE