Just a quick status update, for those who (still) care :-)

Had the plumber in yesterday, and we worked on getting the two sinks hooked up to the drain, as well as bringing in water. The drains are done (and very neatly done, as well), and the water is *just* about done.

Turns out we ran out of 90 deg. elbows, and the hardware store was closed by that time, so we couldn't finish the job. Bummer, that. I'm going to pick up a few more elbows tonite (more than I need!), which will allow us to finish the job.

The Intellifaucet is all hooked up as well, with water wired into it. Can't test it out, however, until I get the water to the tables setup.

Soon. Very soon.

Cheers all!